Home Standby Generator

Don’t be in the dark. Keep your home or business running during a power outage by installing a home  Read More


Switchboard and Kirk key interlock Installation

We recently installed a 3,000 amp switchboard with a Kirk key interlock, a 2,000 kva 12,470 volt to 480 volt  Read More


Warehouse lighting improvements and savings

G.R. Smalley, Co. recently completed a lighting project for a warehouse facility.  Here are the project details:

Lighting quality was greatly  Read More


Alarm Panel Installation

We recently installed an alarm panel for a regional bank. (See photos)


Thermal Scan Reporting

We routinely conduct thermal scans of the electrical panels to ensure our clients’ electrical systems are running properly. Here is  Read More


CASE STUDY: Trigon Forge

1. Quality control lab – Replaced ceiling lighting that was T12 U bend fluorescent that used 72 watts per fixture to  Read More


CASE STUDY: St. John The Baptist

1. Sanctuary lighting – We re-lamped existing fixtures from 500 watt incandescent to 90 watt CFL, thus reducing energy consumption  Read More


Conduit and inner duct for fiber optic cable installation

These photos are of a recent conduit and inner duct for fiber optic cable installation completed by George R. Smalley  Read More


CASE STUDY: Sprowls Insurance

Replaced fluorescent office troffers that used 156 watts per fixture with LED retrofit fixtures that use 47 watts per fixture, resulting  Read More


CASE STUDY: Hunter Truck Sales

1. Replaced 400 watt metal halide fixtures with 147 watt T8 fluorescent fixtures, resulting in a reduction of 64% in energy  Read More